01 · The five Necessities → Power
04 / 05 · Power
Power Systems
Grid orchestration, storage, EV charging, distributed energy. Cannot connect without compliance proof.
The need01 / 04
Storage, EVs, buildings, and distributed assets are becoming active grid participants, not passive loads. A heatwave hits. Rooftop solar floods the grid with no coordination. Batteries sit idle because nobody filed the dispatch paperwork. The blackout was avoidable.
Tier 1: grid connection licensing, renewable targets, building energy codes. Tier 2: carbon pricing, embodied carbon disclosure.
The filter02 / 04
30 regulations mapped. 22 T1, 8 T2.
EX-9 Crystallisation window
In-flight regulations by expected effective year. None yet in force.
None in force Peak · 2028
| Market | Regulation | Tier | Status |
|---|---|---|---|
| AU | Capacity Investment Scheme. Renewable Targets | T2 | Expected 2027 |
| AU | NCC 2025. State Adoption Completion | T1 | Expected 2027 |
| SG | Carbon Tax Increase (SGD 45/tonne) | T1 | Expected 2027 |
| JP | GX Carbon Pricing. Full Implementation | T1 | Expected 2028 |
Sourcehmm Ventures regulatory dataset. Basis7 dated obligations, 2024 to 2030.
The cohort03 / 04
581 companies mapped to the Power Systems Necessities.
EX-10 Necessities-aligned cohort
581 companies. Highlighted marks are named outcomes in regulated companies.
Sourcehmm Ventures four-market classified dataset.
The four markets04 / 04
- Australia Late-stage round
Neara
- Japan In-flight regulation
GX Carbon Pricing. Full Implementation
- New Zealand In-flight regulation
Building Code Update. Embodied Carbon Requirements
- Singapore In-flight regulation
Carbon Tax Increase (SGD 45/tonne)